Cassero a perdere per solai alleggeriti U-Boot Beton

Espace Tourbillon – the future of Geneva

Daliform Group has started a very prestigious project in Geneva, more exactly in Plan-les-Ouates.

We are talking about Espace Tourbillon, a 95.000 smq complex that includes the construction of 5 buildings to host offices, apartments, restaurants, shops, storage areas and various public spaces. Furthermore, the tramway line will be ended in 2019 and guarantee a direct connection with the city’s key points.

All the above-ground slabs – around 85.000 smq – are under construction with our system U-Boot® Beton, preferred to other solutions of lightened slabs, for its versatility, easy installation and storage: an essential advantage if you think about the organization of the goods in a so great building site, located in a high urbanized area.

The end of the works is expected for 2021 and Espace Tourbillon is expected to bring economic and commercial benefits to the city and the entire Switzerland.

Inaugurated a new branch of Zanutta spa in Oderzo

Saturday 24th November a new branch of Zanutta spa, a really important costumer for Daliform Group, was inaugurated in Oderzo. During the day, all its greater suppliers had the opportunity to exhibit their products.
There was a large turnout of the public, about 1500 people, who wanted to celebrate with Zanutta spa this important goal of the Friulan group.

 

Tour DUO: another important goal for the Company

Image © Ateliers Jean Nouvel

 

They are two towers, designed by the great French architect Jean Nouvel to give an unrivalled level of comfort and to develop new ways of working; located on the railway station’s quarter of the 13th arrondissement of Paris, they will reach a significant height of 180 and 122 meters, accommodating respectively 39 and 29 floors.

Daliform Group supplied 2.500 sqm of Iglù® Plus for the treatment of the polluted soil and for the realisation of refills on the foundation floor, facilitating the passage of utilities, with the purpose of improving the organisation of the available spaces.

The works started in late March 2017 and are expected to end in 2020, when Parisians and non-Parisians, could benefit from new offices, shops, restaurants and a luxury hotel.

 

The U-Boot® Beton of Daliform Group for the Mall of Sousse – Tunisia

Once it is over, it will be the greatest shopping centre in Tunisia: we are talking about the “Mall of Sousse”.

A really prestigious project, in which Daliform Group is protagonist with the great supply of U-Boot® Beton for the realisation of 65.000 sqm of slab. The system was chosen by one of the most important design studio in Tunis, for its countless advantages. First of all, the opportunity to obtain performing slab structures, with important savings on concrete if compared to a full slab of the same thickness. This saving corresponds to a reduction in the self-weight of the slabs, a significant decrease in the incidence of steel reinforcement and the optimization of the elevation structures (pillars, columns, shear-walls) and foundation structures.

The first stone was laid by the Tunisian Republic’s President on October 4, 2017 and the works are going on very well now; the shopping center will be probably open to the public at the beginning of 2019. People will find about 120 shops, a big supermarket, a cinema, a great restaurant area and much more.

Daliform Group for „Setti“ Square in Treviglio – Bergamo (Italy)

© GRITTI ARCHITETTI

 


«A real “living room” in the city center, complete with underground parking»: this is the beginning of the article’s subheading on the “Eco” of Bergamo of May 19th, which introduces the new “Setti” Square in Treviglio (Bergamo) – Italy.

This is a really important project above all for its values of union, conviviality and security, in wich Daliform Group had part in the realization of the underground parking with 2 floors, where we can find 219 car parks.

The product employed is U-Boot® Beton. Thanks to it, it was possible to maximized the potential of lightened slabs in order to obtain large spans between the vertical structures.

In this way it was possible to create more spacious areas and obtain the largest number of parking places possible, and at the same time guaranteeing excellent performance in terms of fire resistance.

To find out more about the advantages of our product click here.

Daliform Group at “ The Big 5 Heavy” 2018

On Wednesday 28 March the first edition of Dubai’s „The Big 5 Heavy“ 2018, in which Daliform Group exhibited its constructive solutions, ended. For the first time the Middle East Concrete, the PMV Live, the Foundation and Geotechnical, the Mining and Quarrying and the Road Construction sectors have been divided from the main event “The Big 5” which took place in November 2017, creating a total dedicated exhibition, in which the exhibitors had the opportunity to meet a high number of solely dedicated customers.

Photo of the previous edition: http://easyengineering.eu/?p=9605

Daliform Group erzielte die Verlängerung der Gesetzlichkeit-Rating

Am Mittwoch, den 7. Februar 2018 hat die Garant-Autorität für die Konkurrenz und den Markt der Firma Daliform Group die Verlängerung der Gesetzlichkeit-Rating, mit einem Spielstand von zwei Sternen und einem +, erteilt.
Es handelt sich um einen anderen wichtigen Schritt für die Firma, die seit immer sehr aktiv ist, um die Gesetzlichkeit- und Durchsichtigkeit-Werte zu respektieren.

CSTB renewed Avis Technique

Once again, Daliform Group is proud to communicate that, after some laboratory tests and inspections, the certification AVIS TECHNIQUE has been renewed for the products Iglu’® and Iglu’® Plus.