{"id":49741,"date":"2016-05-26T15:50:05","date_gmt":"2016-05-26T13:50:05","guid":{"rendered":"https:\/\/www.daliform.com\/sistema-atlantis\/applications-sistema-atlantis\/formwork-raft\/"},"modified":"2021-09-13T14:37:07","modified_gmt":"2021-09-13T12:37:07","slug":"formwork-raft","status":"publish","type":"page","link":"https:\/\/www.daliform.com\/en\/atlantis-permanent-formwork-ventilated-crawl-spaces\/applications-sistema-atlantis\/formwork-raft\/","title":{"rendered":"Formwork raft"},"content":{"rendered":"<p>[vc_row padding_top=&#8221;0&#8243; padding_bottom=&#8221;0&#8243;][vc_column]\n\t<div class=\"custom-heading wpb_content_element  heading-medium\">\n\t\t<h2 class=\"heading-title\" >With the Atlantis System it is possible to create very stiff foundations (box or box bed) at low costs.<\/h2>\n\t\t<span class=\"heading-line primary\"><\/span>\n\t<\/div>[\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;37801&#8243; img_size=&#8221;full&#8221;][\/vc_column][vc_column width=&#8221;1\/2&#8243;][vc_column_text css=&#8221;.vc_custom_1594368940386{margin-bottom: 25px !important;}&#8221;]<\/p>\n<h5 style=\"text-align: justify;\">Thanks to the <strong>Igl\u00f9<sup>\u00ae<\/sup> or Atlantis formworks from the Daliform Group , in association with L-Plast panels or Muro formwork, it is possible to complete the raft structure in only two phases<\/strong>; that is casting the lower slab on which the Daliform Group products are positioned and then casting the beams and compression slab at the same time. This makes it possible to create extremely rigid foundations at a limited cost.<\/h5>\n<p style=\"text-align: justify;\">The main function of the foundation structures, such as the one proposed by the <strong>Atlantis System<\/strong> is to distribute the loads from the pillars, plates and walls to the ground and at the same time anchor the building to the ground, guaranteeing its stability. In some cases, always using the Atlantis System, <strong>foundation piles can be eliminated<\/strong>, which would instead be necessary with other construction solutions.<\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column][vc_empty_space height=&#8221;20px&#8221;][vc_column_text css=&#8221;.vc_custom_1594368933242{margin-bottom: 25px !important;}&#8221;]<\/p>\n<p style=\"text-align: justify;\">The purpose of the foundation structures is to minimise deferred deformation due to the irregularity of the ground and asymmetric loads to ensure building stability. It is the two latter aspects that represent the true danger to the integrity of the foundation and the overlying structure. Once the type of foundation that is best suited for distributing the loads in the ground has been identified, based on the characteristics of the building and ground, the problem goes from being technical to economical, therefore the most economic solution must be identified for implementing the selected solution.<br \/>\nA solution to this problem, without changing the type of structure, is to create a box type raft (or formwork). This obtains a honeycomb structure consisting of two flat plates connected by mutually perpendicular beams: lower and upper slabs with a thickness of 15-20 cm with connection beams with a height of 70\u2013120 cm positioned at variable centre distances depending on static requirements. Thanks to the <span class=\"s1\">Igl\u00f9<sup>\u00ae<\/sup><\/span> or <span class=\"s1\">Atlantis<\/span> formworks from the Daliform Group , in association with <span class=\"s1\">L-Plast<\/span> panels or <span class=\"s1\">Muro formwork,<\/span> it is possible to complete the raft structure in only two phases; that is casting the lower slab on which the Daliform Group products are positioned and then casting the beams and compression slab at the same time. This makes it possible to create extremely rigid foundations at a limited cost.<\/p>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_separator][vc_column_text css=&#8221;.vc_custom_1592297006811{margin-bottom: 15px !important;}&#8221;]<strong>SUGGESTED PRODUCTS:<\/strong>[\/vc_column_text][vc_empty_space height=&#8221;10px&#8221;][\/vc_column][vc_column][vc_masonry_grid post_type=&#8221;ids&#8221; element_width=&#8221;3&#8243; grid_id=&#8221;vc_gid:1627985728897-b0e7b1fa-8089-6&#8243; include=&#8221;1034, 4579&#8243; el_class=&#8221;text-size-p&#8221;][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Thanks to the Igl\u00f9\u00ae or Atlantis formworks, with L-Plast panels or Muro formwork, it is possible to complete the raft structure in only two phases.<\/p>\n","protected":false},"author":1,"featured_media":57855,"parent":37641,"menu_order":2,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.daliform.com\/en\/wp-json\/wp\/v2\/pages\/49741"}],"collection":[{"href":"https:\/\/www.daliform.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.daliform.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.daliform.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.daliform.com\/en\/wp-json\/wp\/v2\/comments?post=49741"}],"version-history":[{"count":0,"href":"https:\/\/www.daliform.com\/en\/wp-json\/wp\/v2\/pages\/49741\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/www.daliform.com\/en\/wp-json\/wp\/v2\/pages\/37641"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.daliform.com\/en\/wp-json\/wp\/v2\/media\/57855"}],"wp:attachment":[{"href":"https:\/\/www.daliform.com\/en\/wp-json\/wp\/v2\/media?parent=49741"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}